Product Detail :
|
UNDER FRAME (LWLRRM PP) . * UNDERFRAME COMPLETE FOR LWLRRM AMRIT BHARAT COACHES TO DRG. NO.LP11103,
ALT d, ANX 9 WITHOUT ITEM 30 TO DRG. NO.1.11012.0.03.095.001 WITH ADDITIONAL BRACKETS TO
DRG NO 53811115, Alt a. THE MANUFACTURING FACILITY AS PER ICF/MD/SPEC-147, ISSUE STATUS-0
1, REV-02 WITH AMENDMENT No.02. Special Condition THE UNDERFRAME SHOULD BE SUPPLIED AS
NORMAL SIDE UP AND SIDE BEARER SIDE DOWN. PACKING CONDITION AS PER DRG NO. ICF/J&T/MISC-
2487, Alt b. STAGE INSPECTION DETAILS. (a) Raw Material Stage Ensure the raw material used usin
g portable spectrometer (b) Jig stage Assembly of front part with sole bar. Assembly of modular fr
ame arrangement. Weld parameters to be checked & recorded (c) Trestle stage Marking, Drilling
& Tapping of holes wherever necessary. Marking & placing of detail items. Complete welding whe
rever necessary. Weld parameters to be checked & recorded Assembly & Welding of trough sheet
s. Dimensional & Visual checks. Punching of Serial No & ensuring proper traceability. (d) Surface p
reparation and painting stage. Short/Sand blast to the requirements. Painting process as per the s
pecification. Visual inspection. Final product Inspection. Note Application of Aluminium welding co
at to RCF spec MDTS-28272 latest revision on top surface of cross members shall be ensured before w
elding the trough floor with cross members to avoid bi-metallic corrossion.[SAFETY ITEM] [ Warranty
Period 30 Months after the date of delivery ]
[Quantity Tolerance (+/-) 5 %age , Item Category Normal , Total PO value variation Permitt
ed Max 8 lacs ] ]
|