Product Detail :
|
Construction of 4 – lane elevated road as a part of jp ganga path (digha to deedarganj from nurruding ghat (ch 16+975.79 km) to dharamshala ghat (Ch 19+890 km) (length 2.914 km) with allied facilities and widening and strengthening of existing road to 4 – lane from the junction of JP ganga path at deedarganj (Ch 20 + 500 km) to ROB approach on SH – 106 (Old nh – 30) (Length – 750 Mtr) & development of 4 lane road from patna sahib railway station (Ch.0+000) to patna ghat (Ch. 1+550) in replacement of existing old railway line of patna sahib – patna ghat at patna in the state of bihar on EPC mode.
|